NEW SINGLE FAMILY DWELLING
The following is a list of the typical inspections required for a new residential building:
Foundation: Location of forms to assure proper setbacks
Plumbing: Rough In, Sewer Line, Water Line, Yard Gas Line and Form Board Survey if Required
Foundation: Beams, Steel, Post Tension, Plumbing Protected
Framing: Structural Framing, Plumbing Top Out, HVAC, Rough Gas Test and Electrical
Residential Energy, Envelope and Wall Tie
Electrical: Temporary Electrical
Plumbing: Jacuzzi, Marble Tub
Building Final: Building, Electrical, Plumbing, HVAC, Energy, Site Grading
ELECTRICAL
Temporary Pole
Electrical Rough
Electrical Final
FENCE
Fence Location & Conformance to Zoning Regulations
AIR CONDITIONING & HEATING (HVAC)
HVAC Rough In, Energy and Gas Test (if necessary)
HVAC Final and Energy Final
PLUMBING
Sewer Line
Water Service Line
Gas Service Line
Plumbing Rough Sewer
Plumbing Top-Out
Plumbing Final
RETAINING WALL (Over 4 feet)
Retaining Wall Location and Final
WATER HEATER REPLACEMENT
Water Heater Final
POOLS
Stakeout/Location
Pool Belly Steel and Ground, Door Latch or Alarm
Pool Gas Rough In and Test
Pool Final and Enclosure
|